MOQ: | 100KGS |
Price: | Negotation |
Standard Packaging: | They are usually packed in conventional export wooden cases. |
Delivery Period: | 2-10 work days |
Payment Method: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Capacity: | 2000tons/per month |
Attribute | Value |
---|---|
Material | 304, 304L, 306, 306L, 316, 316L |
Application | Connection, Decoration, oil and gas, Automotive |
Standard | ASTM, AISI, GB, JIS |
Shape | Raising face, Flat face, Tongue face, Groove face |
Package | Standard Seaworthy Packaging, wooden cases |
Certification | ISO, API, BV, CE |
Connection | Welding |
Pressure | PN6 to PN400 |
Type | Pipe Fitting |
Brand Name | Yuhao |
Slip-On Plate Flanges are designed for easy welding and installation, available in materials like 304, 316 stainless steel, and carbon steel. These flat, plain flanges are ideal for low-pressure applications, ensuring a secure connection in piping systems. Compliant with ISO and API standards, they offer durability, corrosion resistance, and reliable performance in various industrial environments.
DN | Pipe OD | Connection Size | Flange Thickness(mm) | C | Flange ID | A | B | Flange OD | Bolt Hole Circle Diameter | A | B |
---|---|---|---|---|---|---|---|---|---|---|---|
10 | 17.2 | 14 | 90 | 60 | 14 | 18 | 15 | ||||
15 | 21.3 | 18 | 95 | 65 | 14 | 22.5 | 19 | ||||
20 | 26.9 | 25 | 105 | 75 | 16 | 27.5 | 26 |
Quality is priority. We pay much attention to the quality check. Every product will be fully assembled and carefully tested before it's packed for shipment.
We can supply the kinds of metal raw materials and products, such as pipes, pipe fittings, flanges, coil, sheet, round bar and so on.
The MOQ for each product is different, so it would be recommended to refer to the detail page of the product you are interested in. If you need further clarification, send me the product link, and I will reply as soon as possible.
Yes, we could offer the sample for free charge but do not pay the cost of freight.
Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.