MOQ: | 100kgs |
Price: | Negotiation |
Standard Packaging: | Standard sea worth bundles,Standard Plywood cases |
Delivery Period: | 15days |
Payment Method: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Capacity: | 2000tons/per month |
Attribute | Value |
---|---|
Wall Thickness | SCH20-SCH160 |
Customized Support | OEM, ODM, OBM |
Shape | Elbow |
Surface Treatment | Mirror, Polishing, Sandblasting, Sand Rolling |
Connection Type | Butt Welded |
Application | Oil, Gas, Chemical, Petrochemical, Power, etc. |
Size | DN6-DN1000 |
Standard | EN, ASTM, AISI, DIN, JIS |
Grade | 304, 304L, 316, 316L, 321, 310s |
304 stainless steel long radius 90° socket weld elbows are precision-engineered for high-pressure/high-temperature industrial applications, offering exceptional corrosion resistance and durability. Their 1.5D long-radius design minimizes turbulence and pressure drop, while the socket weld ensures leak-proof connections.
Ideal for chemical, petrochemical, and oil & gas industries, these ASTM-compliant elbows facilitate smooth 90° directional changes with optimal flow efficiency. The premium 304 stainless steel construction guarantees reliability in demanding piping systems.
Nominal Diameter | Outside Diameter | Center to End | Center to Center | Weight (kg/pc) | SCH5S | SCH10S | SCH20S/LG | SCH40S/STD | SCH80S/XS | SCH80 | |
---|---|---|---|---|---|---|---|---|---|---|---|
15 | 1/2 | 18 21.3 |
16 | 38 | 76 | 0.04 0.05 |
0.05 0.06 |
0.06 0.07 |
0.06 0.08 |
0.08 0.10 |
0.08 0.10 |
A: Quality is priority. We pay much attention to the quality check. Every product will be fully assembled and carefully tested before it's packed for shipment.
A: The MOQ for each product is different, so it would be recommended to refer to the detail page of the product you are interested in. If you need further clarification, send me the product link, and I will reply as soon as possible.
A: Yes. Let me know the specific customization requirements, and I will get back to you as soon as possible.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.